• Blog
  • Contact
  • Downloads
  • Hotline & Onlinesupport
  • SUCCESS STORIES
  • EN 

    Choose your language

    • English
    • German
    • Chinese
    • Italian
    • Spanish
    • French
    • Hungarian
LiSEC Logo
  • Blog
  • Contact
  • Downloads
  • Hotline & Onlinesupport
  • SUCCESS STORIES
  • EN 

    Choose your language

    • English
    • German
    • Chinese
    • Italian
    • Spanish
    • French
    • Hungarian
  • Solutions
    Systems & Lines
    • Glass Cutting Line
    • Logistic systems
    • Insulating glass line
    • Glass Processing Line
    • Laminated Glass Line
    • Preowned machines and lines
    Individual Machines
    • Glass Cutting
    • Insulating Glass Production
    • Sorting & Logistics Systems
    • Laminated Glass Production
    • Flat Glass Processing
    • Circular Economy
    • Preowned machines
    Software
    • Business Solutions
    • Production Planning
    • Manufacturing Execution
    • Supplemental Tools
  • Competence
    After Sale / Service
    • HOTLiNE & ONLiNE SUPPORT
      HOTLiNE & ONLiNE SUPPORT
    • LiSERV
      LiSERV
    • MyLiSEC customer portal
      MyLiSEC customer portal
    • LiSEC Training
      LiSEC Training
    • Spare Parts
      Spare Parts
    • LONGLiFE
      LONGLiFE
    • Inspection and Maintenance
      Inspection and Maintenance
    • Claim Management
      Claim Management
    • LiSAIR Express Delivery
      LiSAIR Express Delivery
    • FAQ
      FAQ
    Spacer
    • Spacer products - LiSEC.com
      Products
  • Careers
    Working at LiSEC
    Vacancies
    Apprenticeship at LiSEC
    A day at LiSEC
    Tag der offenen Lehrwerkstatt
    Online Application
    Career fairs
    Contact
  • News
    News
    Success Stories
    Events
    LiSEC Newsletter
    Press contact
    Press distributor
    Downloads
  • About LiSEC
    Company
    Management
    Company History
    Sustainability
    Sponsorship
    Purchasing
    Contact
  • LiSEC
  • Success Stories
  • 6 factors for installing a LiSEC machine successfully

6 factors for installing a LiSEC machine successfully

October 15, 2025

A LiSEC stand-alone machine is an excellent choice for optimising production processes and increasing efficiency. However, there are some points to consider before starting installation, in order to ensure that everything goes smoothly and that the machine can be started up optimally.

© LiSEC; It is important to clarify whether a crane, a forklift or other lifting equipment is available in advance
© LiSEC; Defining a central point of contact and a joint understanding of the agreed deadlines is an important prerequisite
© LiSEC; Information regarding applicable safety requirements and legal regulations must be provided to the LiSEC fitters
© LiSEC; A clean and prepared installation location is a prerequisite to ensure that work can start immediately
© LiSEC; Clarifying the air and power connections
/
/
  1. Defining a central point of contact
    Successful installation starts with designating a point of contact who has comprehensive information on the project. This person knows the circumstances and the conditions on-site, as well as the systems for the new machine and is familiar with the operational details. They assist with installation from planning to acceptance and are available on-site for any issues or queries that the LiSEC fitters may have. A central point of contact eases quick decision making and problem solving on-site, which minimises delays and ensures a smooth installation process.
  2. Ensuring deadline clarity
    Another important aspect for successful cooperation is ensuring mutual understanding when it comes to the agreed deadlines. Both the delivery date and the start of installation must be clearly defined for all involved. Careful agreement avoids duplicate journeys, delays on-site and unfulfilled expectations on both sides. Therefore, both the customer and the LiSEC team are well prepared and fully satisfied with the installation process.
  3. Clarifying the air and power connections
    An in-depth prior clarification of the connection values for air and power is another decisive factor for smooth installation. This clarification can take place in a meeting between the installation coordinators at LiSEC and the customer’s central point of contact around two weeks before the delivery date. By exchanging all relevant information, many potential problems can be solved in advance. This saves time and avoids short-term workarounds.
  4. Announcing the availability of lifting equipment
    Advance information on the availability of the lifting equipment required for installation is decisive for managing delays and risks. It is important to clarify whether a crane, a forklift or no lifting equipment is available in advance. If a crane has to be organised, this can be planned in advance in order to avoid unnecessary delays and to minimise the risk.
  5. Information regarding applicable safety requirements and legal regulations 
    Advance information on the local safety requirements or the safety topics relevant for the LiSEC fitters enables work to be planned and carried out efficiently. In this way, all people involved can ensure that they take the required precautions in order to prevent accidents and injuries. In addition, the knowledge of these regulations helps to ensure that all work is performed in accordance with the applicable laws.
  6. Prepared installation location
    The last success factor is a well prepared location for installing the new machine. If the location for the machine is clean and clear for the LiSEC installation team, they can start work immediately. Time-consuming, last-minute coordination on-site is unnecessary and installation is efficient and timely. It is also very important to check the ground conditions with regard to unevenness and slopes.

Considering these six factors aids with installing the LiSEC machine considerably. LiSEC is available at any time to ensure that the process is as smooth as possible. Active cooperation provides the best prerequisites for successful start-up.

Note:

Installation of large projects at LiSEC is supported by a project manager as standard. The installation coordinator at the local branch is available to you as a point of contact for smaller projects and stand-alone machines. They will ensure that LiSEC provides all relevant information and resources in good time. The coordinator responsible for your region is specified on our website.

Service_Installation.zip (16 MB)
Claudia Guschlbauer

Please contact me

Feel free to contact me if you have any further questions.

Claudia Guschlbauer
Director of Marketing & Corporate Communications

Tel: +43 7477 405-1115
Mobile: +43 660 871 58 03
E-Mail: claudia.guschlbauer@lisec.com

Contact E-MailContact FormGeneral Information

LiSEC Newsletter Service

Follow us

About LiSEC
  • Locations & Contact
  • Company
  • Purchasing
  • Careers
Service
  • Training
  • FAQ
  • LiSERV
  • MyLiSEC
News
  • News
  • Events
  • Downloads
  • Press contact
  • Newsletter
  • Copyright © 2025 LiSEC
  • Imprint
  •  
  • Privacy Policy
  •  
  • Cookie Policy
  •  
  • Cookie Settings
  •  
  • Transparency Line
  •  

all.in.one:solutions